Nettie Long Add-CS 980916COPPELL, TEXAS 75019
Sharon Watts
537 Raintree Circle
Coppell, TX 75019
Nettie Long Addition, Lot 1 (900 Deforest Road)
Development Fee Assessment
Dear Ms. Watts:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, al
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $3,265.00 and
Finance Department along with a copy of the Fee Assessment table. This amou
of the assessed fees which need to be paid prior to Council approval. Please tel
table for additional fees. Also provide a copy of the Engineer's estimate or con
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help u
payment of required fees and insure a successful beginning of this project. We
to working with you on this project. If you have any questions, please contact ~
Michael A. Martin, P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
RO. Box 478
Coppell. Texas 75019
972-462-0022
3cptcmbcr 16, 1998
ongwitha copy
forward to the
nt is a portion
~r to attached
u'act to our o~ce
to verify the
,ok forward
re.
DEVELOPMENT FEE TABLE
Project: Nettie Long Addition, Lot I (900 Deforest Road)
Date: 9/16/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $1,125.00 $1,125.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter) '
Water Meter Fee (Domestic) $57.75
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100 % due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $0.00
(100 % due at Issuance of Water Meter)
Wastewater Impact Fee $0.00 * $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permi0
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $1,285.00 $1,285.00
(100% due prior to Council Approval)
Roadway Impact Fee $855.00 $855.00
(100% due prior to Council Approval)
Street Light Fee
(100% due prior to Acceptance of Project N/A
Street Sign Fee
(100% due prior to Acceptance of Project N/A
Construction Inspection Fee
N/A
TOTAL $3,407.75
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $3,265.00
The property owner has chosen to use a septic sytstem as allowed in agriculture zo~ ung
DEVELOPMENT FEE WORKSHEET
PROJECT: Nettie Long Addition, Lot 1(900 Deforest Road)
DATE: 9/16/98
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
1 - 1 inch = 2.5
Fireline Meter(s): =
Total #: 2.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total 0: 1 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total 0: 1 Domestic Meter(s) @ $57.75
(Single family due prior to issuance of building permit)
(Ail other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total 0: 0 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
0
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total 0: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
* The property owner has chosen to use a septic sytstem as allowed in agriculture zoning
Page 3
ESU's
ESU's
ESU's
ESU's
$1,125.00
$50.00
$57.75
$0.00
$0.00
$o.oo
$35.00
$0.00
$0.00
$0.00
$0.00
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 4
N/A
N/A
N/A
N/A
$1,285.00
N/A
$855.00
N/A
N/A
N/A
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Nettie Long Addition, Lot 1 (900 Deforest Road)
9/16/98
ROADWAY IMPACT FEE:
Service Area *
Catego~ **
Land Use **
Buildin~ Size (Sq. Ft.)
2
Residential
Single-Family Detach
N/A
Development Units ** 1
Vehicle Miles per Development Unit ** 2.85
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
~ehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
* (Figure 2 - Roadway Impact Fee ~
** (Table 3 - Roadway Impact Fee SI
*** (Schedule 2, Page 3 - Roadway In
~d
$855.00
mdy)
udy)
~act Fee Study)
nMOVnW DUF~: $S5~.00 ~