Loading...
Magnolia Park-CS 990322)The City With'A Beautiful Future ~ P,O. BOX 478 COPPELL, TEXAS 75019 March 22, 1999 Mr. Elvio Bruni, Development Director Eastern Development Companies 5225 Village Creek Drive, Suite 400 Piano, Texas 75093 RE: Magnolia Park Dear Elvio: The City of Coppell has recently completed a follow-up walk thru for the ix referenced project. Listed below and attached are items that must be addr~ acceptance. 1. Eliminate standing water in common areas at entrance and finish gradi slopes. 2. Complete sidewalk connection at entrance and at emergency exit at S.H. 3. Saw, remove and replace broken concrete on the south side of alley, 4 Cottage Lane. 4. Complete gravity wall tie into headwalls on the north and south ends of 5. Inlet grate is missing on Storm Drain Line B-1 at Alley A-2 and Alley 3 6. Key will not work in some inlet lids. 7. Clean storm drain system. 8. Provide permanent erosion control. 9. Two inch blow-off at Block E, Lot 34-35 in leaking. 10. Please insure that the required bonds and as-built plans are submitted. Thank you for your cooperation, if you have any questions please do no hesital CC: Les Roberts, Site Concrete, Inc. 972-513-0661 (fax) Jimmy Clack, J.F. Clack, Inc. 903-527-4445 (fax) RO. Box 478 Coppell, Texas 75019 972-462-0022 aprovements in the ;ssed prior to final ag in parkway and .21. west of Bankers e to call. Sent dF CLACK [NC 9035274445 04/13/99 11:40AM J. F. CLACK, Inc. 1470 County Road 27'1Z Caddo Mills, TX 75135 April Mr, Garreth Campbell Construction Inspector City of Coppeil t'()..Bon 478 Coppell, TX 75019 RE: Magnolia Park l)¢~r Garreth. We will correct deficiencies for our work as nm,x! by your Ma~ch 22, 1999 when we mobilize to build the Weir Stmclure, which will be no later than Please conlacl me if you have any queslions. Sincerely, Jimmy Clack cc: Elvio Bruni, Fa,stern Development Companies Oct~ 530 ranch list, ~rJl ltl 199c~. Page 2/2 15/1955 89:42 9728i87'~5 9728188885 EASTERN ~Eastern Development Companies '52~ V'dla~ Creels Drive. Suite 400, Phmo, Texas (972) 267-6888, F.~ (~72) 818-8,q8,~ April 1 4, 1999 Oan. edl Campbell City of Coppell 255 Parkway Blvd. Coppeil, Texns 75019 Pursuant to our walk today, Eastern Development commits to comple possible: Backfill the sidewalk at fi.om e~lzance ,, center ishnd when weather allows Complete sidewalk on 12I when gas company finishes 4. Complete sidewalk on parkland at Denton Tap (coordinate with City on t Denton Tap) 5. Sod ~-ntran~ along side 6. Install ~rlex along alley behind model 7. Add curlex along perimeter wall on Highway 121 8. Add additional curlex at Natches and Waverly intersection 9. Add signs along street connection to Hi.way 121 10~' Revise as-buitts per changes mnrked by CRy .,a. P~rk sidewalk b. Veri~ ~Ol elevation ¢. Include weir plans in tss-builts 11. Prepare easement for sidewalk on South entrance drive. If you have any additional items, please let me know and I will send eom ~~ty, '.Elvio Bnmi Development DireoWr PAGE ime due to traffic on mitment letter on 01