Loading...
WA9302-LR 951106 (4)'EOTECHNICAL E GEE Consultants, Inc. EiNViRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 GENERAL REPORT Report Date November 6, 1995 Test Date: October 31, 1995 client City of Coppell General Report No.: 4 Project 6.0 MG Water Storage Tank Project No.: 95-0220 Identification Pier Inspection Method of Test Visual Observation Results Scheduled time: 7:30 am Type of service scheduled: Pier Inspection Time left lab: 7:00 am Time arrived at job: 7:25 am Time left job: 11:30 am Time returned lab:, 11:45 am Total Charged Time: 4.75 hrs. Reason: Contractor set 5 pipes for casing, but they did not pour concrete due to wet conditions in the field. Concrete truck can not move on pad so they decided to cancel. Technician: P.Chen cc: Mr. Larry Davis - City of Coppell Mr. Bob Barbarisi, Jr. - Natgun Corporation Mr. Gary Hendricks - Shimek, Jacobs and Finklea