Magnolia Park-CS 980915COPPELL, TEXAS 75019
September 15, 1998
Lori Allen
Eastern Development Companies
5225 Village Creek Drive
Suite 400
Plano, TX 75093
RE: Street Sign Fee Assessment / Magnolia Park
Dear Ms. Allen:
Enclosed with this letter you will find the street sign assessment for Magno
final acceptance of this project, a check in the amount of $1,938.75 should l:
City of Coppell and forwarded to Jennifer Armstrong, Finance Director, ale
attached street sign fee assessment list.
Please provide a copy of your paid receipt to our office so that we will be abl~
the required fees and assure a successful completion of this project.
If you should have any questions please feel free to contact me at your conveni
Sincerely /~.
Kenneth M. Gt'ifffn, P.E.
Director of Engineering and Public Works
CC:
Jennifer Armstrong, Finance Director
Greg Jones, Chief Building Official
Doug Stevens, Engineering Technician
Glenn Hollowell P.E., Asst. Dir. of Public Works
P.O. Box 478
Coppell, Texas 75019
972-462-0022
FILE
[ia Park. Prior to the
e made payable to the
ng with a copy of the
to verify payment of
Doug Stevens, Engineering Technician
Per Birdsali , Sign/Signal Technician
Street Division Sign Fee For .,~NO~
The following fee should be assessed and collecte¢
referenced project. 100% due prior to final acceptance
Street Signs Fee
The following assessment is being made in accordance
Coppell Subdivision Ordinance Appendix A Chapter
following cost of those sign materials required are
pricing which is reviewed on a regular basis.
SIGN UNIT PRICE {;{UANTITY E~"
NO Parking
Speed Limit
Street Names
$54.12
$58.77 ~
$7I. 88 L
$90.41 3
$1oo. I4 7
$64.68 --~
$58.77 ~
$34.57
Yield w/names
Stop w/names
Warning Sign
Keep Right (median)
Object Markers (L&R)
* cost breakdowns may be obtained by written request
si gnf ee
on the above
9f project.
d th the City of
VIII A. The
~ased on current
Revised 4/10/98