Loading...
Magnolia Park-CS 980915COPPELL, TEXAS 75019 September 15, 1998 Lori Allen Eastern Development Companies 5225 Village Creek Drive Suite 400 Plano, TX 75093 RE: Street Sign Fee Assessment / Magnolia Park Dear Ms. Allen: Enclosed with this letter you will find the street sign assessment for Magno final acceptance of this project, a check in the amount of $1,938.75 should l: City of Coppell and forwarded to Jennifer Armstrong, Finance Director, ale attached street sign fee assessment list. Please provide a copy of your paid receipt to our office so that we will be abl~ the required fees and assure a successful completion of this project. If you should have any questions please feel free to contact me at your conveni Sincerely /~. Kenneth M. Gt'ifffn, P.E. Director of Engineering and Public Works CC: Jennifer Armstrong, Finance Director Greg Jones, Chief Building Official Doug Stevens, Engineering Technician Glenn Hollowell P.E., Asst. Dir. of Public Works P.O. Box 478 Coppell, Texas 75019 972-462-0022 FILE [ia Park. Prior to the e made payable to the ng with a copy of the to verify payment of Doug Stevens, Engineering Technician Per Birdsali , Sign/Signal Technician Street Division Sign Fee For .,~NO~ The following fee should be assessed and collecte¢ referenced project. 100% due prior to final acceptance Street Signs Fee The following assessment is being made in accordance Coppell Subdivision Ordinance Appendix A Chapter following cost of those sign materials required are pricing which is reviewed on a regular basis. SIGN UNIT PRICE {;{UANTITY E~" NO Parking Speed Limit Street Names $54.12 $58.77 ~ $7I. 88 L $90.41 3 $1oo. I4 7 $64.68 --~ $58.77 ~ $34.57 Yield w/names Stop w/names Warning Sign Keep Right (median) Object Markers (L&R) * cost breakdowns may be obtained by written request si gnf ee on the above 9f project. d th the City of VIII A. The ~ased on current Revised 4/10/98