Loading...
Northlake BC-CS000921 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: NORTHLAKE BUSINESS CENTER, PHASE I REPLAT AND SITE PLAN P & Z HEARING DATE: September 21, 2000 C.C. HEARING DATE: October 10, 2000 LOCATION: Along the west side of North Lake Drive, north of Beltline Road. SIZE OF AREA: Approximately 1.37 acres of property. CURRENT ZONING: LI (Light Industrial) REQUEST: Site Plan and Replat approval. APPLICANT: Applicant: Engineer: B&D Construction Frank Canedy P.O. Box 261402 RLK Engineering Plano, Texas 75026 111 W. Main Street 972-727-4600 Allen, Texas 75013 HISTORY: This property was origiaally platted in 1980 as Northlake Business Center Phase I. This plat divided the land into two blocks and dedicated the right-of-way for North Lake Drive TRANSPORTATION: Northlake Drive is a cul-de-sac street, with a length of 900~_ feet, built within a 60' R.O.W. SURROUNDING LAND USE & ZONING: North- Advantage Self Storage; LI South - Riverside Church of Christ; LI East - warehouse; LI West -vacant; C COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for Light Industrial/Showroom Uses Item # 10 DISCUSSION: This request would allow this 1.37 acre tract to be developed for 109 parking spaces. This parking is to be used as overflow employee parking to serve B & D construction, which is located to the east of this site. The parking lot use is compatible with surrounding developments as well as fulfilling a need for additional parking for an existing business. The parking lot will not be lighted, therefore the use of this lot will be limited to day light hours only. No signage will be permitted on this site except for movement control signs as provided for in Section 29-3.2.(A) of the Zoning Ordinance. The site plan indicates 109 parking spaces with one access point on North Lake Drive. This parking lot has been landscaped in accordance with the provisions of the Landscape Ordinance providing for perimeter and interior landscaping. Non-vehicular landscaping was not required due to the lack of any structures. Approximately 33 % of this tract is devoted to landscaping and 34 trees will be planted. The replat of North Lake Business Center Phase 1 provides for a 24-foot fire lane which will encircle the parking spaces. No additional easements or right-of-way will be required. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of the site plan and the replat for North Lake Business Center Phase 1 ALTERNATIVES: 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Site Plan 2) Landscape Plan 3) Replat document Item # 10