Loading...
Mansions Phase 1-LR 990225.o.o ,... ........ RoneEnqineers i ,Da,as Forl, Wcrtr Da,,~s, Texas Metro,¢,_,:.u'" 7~,..., .-o3-. u.._,~'" 1 r 75229 Fax (972) 241-5:74 GENERAL REPORT PROJECT: Mansions By The Lake REPORT NO: 3137-D7429-359 REPORT DATE: February 25, 1999 CLIENT: Western Rim Services SERVICE DATE: February 16, 1999 REPORT OF: Post Tension On the above service date, M. Fuller, representing Rone Engineers, Inc., arrived on site at the above referenced project to observe the following: Building #12, Cables S-10t, B-30, S-57, were restressed to a reading of 33K and a gauge pressure of 7650 with no change in elongation. Cable S-48 was missing. Building #14, Cables S-101 and S-98 were restressed to a reading of 33K and a gauge pressure of 7650, with Cable S-101 elongation measuring 8" and Cable S-98 elongation measuring 7.5". Both cables were within tolerance supplied by Contractor. Mike Fuller, CMT Supervisor Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon Ihe specific samples provided for testing. We assume no respomibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditiom over which we have no conu'ol. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpw~mrepo~',D7429-359-99\ST Match 3. 1999