Loading...
Mansions Phase 1-LR 990113 (2) Rone lengineers, Inc. l'U~"J4 Goodnight Lane Tel. (972) 241-451=` Ronei=noineers Da ,as.-Foc Wortr' Dallas. Texas Metro (972) 263-1555 ~ii 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansions By The Lake Page 1 of 4 Report No: 3137-D7429-357 Sample Date: December 12, 1998 Client: Western Rim Services Report Date: January 13, 1999 Location: Building//14 Technician: L. Ruiz # Tendon Location Jack Force Gauge Required Elongations Elongations Toual Within No. (Kips) Pressure Elongatiom End (1) End (2) Elongatiom Tolerance 1 B-29 South Side 33K 7700 2.125 2.0 YES 2 B-29 South Side 33K 7700 2.125 2.0 YES 3 S-48 South Side 33K WOO 3.625 3.50 YES 4 B-30 South Side 33K 77OO 2.125 2.0 YES 5 S-10t South Side 33K 77OO 7.50 7.50 -1/4 7.25 YES 6 B-30 South Side 33K 77OO 2.125 2.0 YES 7 B-30 South Side 33K 77OO 2.125 2.0 YES 8 B-30 South Side 33K 77OO 2.125 2.125 YES 9 B-57 East Side Edge 33K 77OO 4.375 4.1255 YES 10 S-57 East Side Edge 33K 77OO 4.375 4.125 YES 11 B-78 East Side Edge 33K 77OO 5 1/8 5.0 YES 12 S-63 East Side Edge 33K 77OO 4.875 4.50 YES 13 S-62 East Side Edge 33K 77OO 4.75 4.50 YES 14 B-62 East Side Edge 33K 77OO 4.75 4.625 YES 15 S-62 East Side Edge 33K 7700 4.75 4.50 YES 16 S-62 East Side Edge 33K 77OO 4.75 4.875 YES 17 B-65 East Side Edge 33K 77OO 5.0 4.875 YES 18 S-65 East Side Edge 33K 77OO 5.0 4.875 YES 19 S-65 East Side Edge 33K 77OO 5.0 5.0 YES Equipment ID: Ram No: 97-267 Pump No: 03196C Gauge No: 97-267 Equipment Calibration Date: 12/11/98 Comments: *Cable #5 is the same cable as 347.5, Total A = 7.25 on Page 4. Distribution: ~ (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (I) Mr. Doyle Damron; C. D. Construction Consulting LIMFFATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or co~itions over which we have no control. Our letters and repom are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-357-98~ST January 29, 1998 ~ Rone C'ngineers, inc. I '~"~4 Goodnight Lane Tel. (972) 241-451 ' Dal~as,'Fort Worth Dallas, Texas Metro (972) 263-1565 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansions By The Lake Page 2 of 4 Report No: 3137-D7429-357 Sample Date: December 12, 1998 Client: Western Rim Services Report Date: January 13, 1999 Location: Building//14 Technician: L. Ruiz # Tendon Locadon Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 20 S-61 East Side Edge 33K 7700 4.625 4.625 YES 21 S-61 East Side Edge 33K 7700 4.62~ 4.50 YES 22 S-64 East Side Edge 33K 7700 4.75 4.75 YES 23 S-64 East Side Edge 33K 7700 4.75 4.625 YES 24 S-64 East Side Edge 33K 7700 4.75 4.625 YES 25 S-62 East Side Edge 33K 7700 4.625 4.75 YES 26 S-64 East Side Edge 33K 7700 4.75 4.50 YES 27 B-64 East Side Edge 33K 7700 4.75 4.875 YES 28 S-62 East Side Edge 33K 7700 4.625 4.62~ YES 29 S-62 East Side Edge 33K 7700 4.625 4.625 YES 30 B-69 East Side Edge 33K 7700 5.25 5.50 YES 31 S-69 East Side Edge 33K 7700 5.25 5.375 YES 32 S-69 East Side Edge 33K 7700 5.25 5.50 YES 33 S-69 E,~t Side Edge 33K 7700 5.25 5.125 YES 34 B-69 East Side Edge 33K 7700 5.25 5.0 YES 35 S-69 East Side Edge 33K 7700 5.25 5.25 YES 36 S-69 East Side Edge 33K 7700 5.25 5.0 YES 37 S-69 East Side Edge 33K 7700 5.25 5.50 YES 38 S-61 East Side Edge 33K 7700 4.625 4.50 YES Equipment ID: Ram No: 97-267 Pump No: 03196C Gauge No: 97-267 Equipment Calibration Date: 12/11/98 Comments: *Cable #5 is the same cable as 347.5, Total A = 7.25 on Page 4. Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Dannon; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports arc for thc exclusive use of the clients to whom they are c:\wpwin\reports\D7429-357-98\ST January 29, 1998 .e.e E~eji.oe~',=, I.e. , 1 t~.'~4 Good~ight Lan~ Tel. (g72) 241-451Z- RoneEn_qineers Dallas,'Foa Worth Da.as, Texas Metro (972) 263-1 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansions By The Lake Page 3 of 4 Report No: 3137-D7429-357 Sample Date: December 12, 1998 Client: Western Rim Services Report Date: January 13, 1999 Location: Building #14 Technician: L. Ruiz # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 39 B-32 East Side Edge 33K 7700 2.25 2.25 YES 40 S-32 East Side Edge 33K 7700 2.25 2.125 YES 41 S-61 North Side Edge 33K 7700 4.625 4.875 YES 42 B-61 North Side Edge 33K 7700 4.625 4.50 YES 43 S-70 North Side Edge 33K 7700 5.375 5.25 YES 44 S-98 North Side Edge 33K 7700 7.50 7.625 YES 45 S-101 ** 33K 7700 7.75 0.5 NO 46 S-101 North Side Edge 33K 7700 7.75 8.125 YES 47 B-75 North Side Edge 33K 7700 5.625 5.875 YES 48 S-102 North Side Edge 33K 7700 7.875 8.125 YES 49 S-102 North Side Edge 33K 7700 7.875 7.785 YES 50 S-102 North Side Edge 33K 7700 7.875 7.625 YES 51 B-76 North Side Edge 33K 7700 5.625 5.375 YES 52 S-98 North Side Edge 33K 7700 7.50 8.0 YES 53 S-98 *** 33K 7700 7.50 0 NO 54 S-98 North Side Edge 33K 7700 7.50 7.75 YES 55 S-98 North Side Edge 33K 7700 7.50 7.50 YES 56 S-101 North Side Edge 33K 7700 7.75 5.75 YES 57 B-74 North Side Edge 33K 7700 5.50 7.50 YES Equipment ID: Ram No: 97-267 Pump No: 03196C Gauge No: 97-267 Equipment Calibration Date: 12/11/98 Comments: *Cable #5 is the same cable as 347.5, Total A = 7.25 on Page 4. **Cable//45, S-101, short. ***Cable #53, S-98, needs repair. No tension. ~ Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hod#e; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Dammn; C. D. Construction ConsultYng LIMITATIONS: The test results presanted herein were prepared based upon the specific samples provided for ~esting. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subjec[ matter provided by persons or conditions over which we have no con,roi. Our letters and reports are for the exclusive use of the clients to whom they are c:\wpwin\reports\D7429-357-98\ST January 29. 1998 Rone Engineers? Inc. I'L"~'34 Goodnight Lane Tel. (972) 241-451:z-- RoneEnoineers Dallas. Fon Wcrtr~ Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansions By The Lake Page 4 of 4 Report No: 3137-D7429-357 Sample Date: December 12, 1998 Client: Western Rim Services Report Date: January 13, 1999 Location: Building//14 Technician: L. Ruiz # Tend Location Jack Force Gauge Required Elongations Elongations Total Within on (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance No. 58 S-101 North Side Edge 33K 7700 7.75 7.625 YES 59 S-101 North Side Edge 33K 7700 7.75 7.50 YES 60 S-101 North Side Edge 33K 7700 7.75 7.50 YES 61 B-79 North Side Edge 33K 7700 6.0 5.785 YES 62 S-15 North Side Edge 33K 7700 0.875 0.785 YES 63 S-27 North Side Edge 33K 7700 2.0 1.785 YES 64 S-27 North Side Edge 33K 7700 2.0 1.785 YES 65 S-27 North Side Edge 33K 7700 2.0 2.0 YES 47.5 S-101 North Side Edge 33K 7700 7.50 7.50 YES Equipment ID: Ram No: 97-267 Pump No: 03196C Gauge No: 97-267 Equipment Calibration Date: 12/11/98 Comments: *Cable//5 is the same cable as 347.5, Total A = 7.25 on Page 4. Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Copper (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (I) Mr. Doyle Dararon; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conn-ol. Our letters and reports are for the exclusive use of the clients to whom they are c:\wpwin\reports\D7429-357-98\ST January 29, 1998