Mansions Phase 1-LR 990112 i~a.~ i~.~i~ee~e. I.d_ ~ o_lz~ C~dni~jht L~n~ .. Tel. (g72) 2z~ 1-z~517- RoneEnQJneers
i
Dallas.-Fort Wo~h Da,as. Texas Metro (972) 263-1
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-346 I Date of Observation 12/15/98 Report Date 01/12/99
To Western Rim Services
Contractor
Supplier LATTIMORE I Plant 3 I Truck 738 I Ticket 3074790
Location BUILDING SLAB//14 - 10' NORTH, 15' EAST FROM SOUTHWEST CORNER
Time Sampled 2:51 Time Batched 1:45 Weather Condition-CLEAR
Concrete Temperature (°F) 64 Ambient Temperature (°F) 59 Mix Number 51
Mix Description Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 6.0
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
154A 7 12/22198 73000 2580 3000/28 DAYS
B 28 1/12/99 101000 3570
C 28 1/12/99 99000 3500
D H
Curing Method I TestMethod I Standard 6" x12" I Engineer/TechnicianS. SPARKMAN
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, AET u~Supervisor, CMT
Remarks and/or Distribution
*WATER ADDED BY PUMP OPERATOR
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction-Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-346-98\ST January 12, 1999