Loading...
Mansions Phase 1-LR 990112 i~a.~ i~.~i~ee~e. I.d_ ~ o_lz~ C~dni~jht L~n~ .. Tel. (g72) 2z~ 1-z~517- RoneEnQJneers i Dallas.-Fort Wo~h Da,as. Texas Metro (972) 263-1 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-346 I Date of Observation 12/15/98 Report Date 01/12/99 To Western Rim Services Contractor Supplier LATTIMORE I Plant 3 I Truck 738 I Ticket 3074790 Location BUILDING SLAB//14 - 10' NORTH, 15' EAST FROM SOUTHWEST CORNER Time Sampled 2:51 Time Batched 1:45 Weather Condition-CLEAR Concrete Temperature (°F) 64 Ambient Temperature (°F) 59 Mix Number 51 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.0 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 154A 7 12/22198 73000 2580 3000/28 DAYS B 28 1/12/99 101000 3570 C 28 1/12/99 99000 3500 D H Curing Method I TestMethod I Standard 6" x12" I Engineer/TechnicianS. SPARKMAN ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, AET u~Supervisor, CMT Remarks and/or Distribution *WATER ADDED BY PUMP OPERATOR Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction-Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-346-98\ST January 12, 1999