Loading...
Mansions Phase 1-LR 990112 (2) Ron~ Ef~§in~r~, If~. 1 :t~94 Goodr~ight Lane ~; TeL (972) 241-451-7-- ! ineers Da~las,'Fort Worth Do,Jas, Texas Metro (972) 263-19o5 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-345 I Date of Observation 12/15/98 Report Date 01/12/99 To Western Rim Services Contractor Supplier LATTIMORE I Plant 3 I Truck 734 I Ticket 3074788 Location BUILDING SLAB #13 - 75' NORTH, 30' WEST FROM SOUTHEAST CORNER Time Sampled 2:06 Time Batched 1:10 Weather ConditiorrCLEAR Concrete Temperature (OF) 62 Ambient Temperature (°F) 59 Mix Number 51 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 Concrete Cylinder Test(s) Specimen I AgeI I Total Load Compressive No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 153A 7 12/22/98 90000 3180 3000/28 DAYS B 28 1/12/99 120000 4240 C 28 1/12/99 131000 4630 D H I I Curing Method I Test Method I Standard 6" x 12" Engineer/Technician S. SPARKMAN ASTMC31I ASTMC39I Area 28.27 sq. in. Signature: Mike Fuller, AET ~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction-Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-345-98\ST January 12, 1999