Loading...
Mansions Phase 1-LR 990107 ¢lo~,e ~:~,=j;,,,e~. Inc. ~o-q40oodn{gh~t Lane TeL (g72/241-4517-- RoneEn ineers Dallas/Fort Worth Dallas. Texas Metro (972) 263-1 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-348 I Date of Observation 12/15/98 Report Date 01/07/99 To Western Rim Services Contractor Supplier LATTIMORE Plant 14 I Truck 823 I Ticket 14082893 I I Location BUILDING SLAB//14- 120' NORTH, 30' EAST FROM SOUTHWEST CORNER Time Sampled 4:17 Time Bitched 2:46 Weather Condition CLEAR Concrete Temperature (°F) 63 Ambient Temperature {°F) 57 Mix Number 51 Mix Description Unit Weight Water Added 15 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/4 Concrete Cylinder Test(s) No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 1 56A 7 12/22/98 70000 2480 3000/28 DAYS B 28 1/1 2/99 C 28 1/1 2/99 D H I Curing Method Test Method Standard 6" x 12" I Engineer/Technician S. SPARKMAN ASTM C 31 ASTM C 39/-~ Area 28.27 sq. in. I Signature: Mike Fuller, AET {~ Supervisor, CMT Remarks and/or Distribution CONTRACTOR WAS INFORMED OF AGE OF CONCRETE LOAD Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-348-98\ST January 7, 1999