Mansions Phase 1-LR 990104 (2)I Dallas..'Fo~ Worth Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
GENERAL REPORT
PROJECT: Mansions By The Lake
REPORT NO: 3137-D7429-354 REPORT DATE: January 4, 1998
CLIENT: Western Rim Services SERVICE DATE: December 22, 1998
REPORT OF: CANCELLATION
On this service date, Tim Duke, represeming Rone Engineers, Inc., arrived on site at the
above referenced project to perform Post Tension Inspection services. Upon arrival, the
technician was informed that this day's activities were cancelled at Contractor's request.
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no respomibility
for variation in quality. (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditiom
over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed.
c:'.wpwin;r~ortsxD7429-354-98;ST lanua~' 4, 1999