Loading...
Mansions Phase 1-LR 990104 (4) .one P,.ngineera, Inc. ~34 aooon,g,, La.e i 24 -4S RoneEngineers Dallas/Fort Worth Dallas. Texas I Metro (972) 263-1555 i: 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-339 Date of Observation 11/24/98 Report Date 01/04/99 To Western Rim Services Contractor Location PAVING- 15' NORTH, 15' WEST FROM NORTHWEST CORNER OF BUILDING #15 Time Sampled 9:15 Time Batched 8:28 Weather Condition CLOUDY Concrete Temperature (°F) 69 Ambient Temperature (°F) 64 Mix Number 61 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 ENTRAINED AIR (%) 3.6 Concrete Cylinder Test(s) Specimen I AgeI ITotalLoadl Compressive No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 1 52A 7 1 2/01 77000 2720 3000/28 DAYS B 28 12/22 102000 3610 C 28 12/22 103000 3640 D H I Curing Method I Test Method I Standard 6" x 12" I Engineer/Technician R. LOVELADY ASTM C 31 I ASTM C 39_1 Area 28.27 sq. in. I Signature: Mike Fuller, AET /~! Supervisor, CMT Remarks and/or Distribution ~_ Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality {composition, appearance, performance, etc.} or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are' addressed. c:~.wpwin'.reports\D7429-339-98\ST January 4, 1999