Loading...
Mansions Phase 1-LR 990104 (5) non~ P. ngin~r~, Inc. 1 ~-~'~4 Oooclnignt Lane TeL (97~:) 24~-45~'~' Dallas/For~ Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-347 I Date of Observation 12/15/98 Report Date 1/04/99 To Western Rim Services Contractor Supplier LATTIMORE [ Plant 3 I Truck 756 I Ticket 3074799 Location BUILDING SLAB #14 - 80' NORTH, 25' EAST FROM SOUTHWEST CORNER Time Sampled 3:33 Time Batched 2:59 Weather Condition CLEAR Concrete Temperature {°F) 62 Ambient Temperature {°F) 58 Mix Number 51 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 3.0 Concrete Cylinder Test(s) No. (Days) (lbs.) Strength (psi) Strength Required (psi) 155A 7 12/22/98 88000 3110 3000/28 DAYS B 28 1/12/99 C 28 1/12/99 D H Curing Method I Test Method I Standard 6" x 12" I Engineer/Technician S. SPARKMAN ASTM C 31 I ASTM C 39r I Area 28.27 sq. in. I Signature: Mike Fuller, AET ~) Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hedge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (comoosition, appearance, performance, etc.] or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are'. addressed. c:'.wpwin\reports',.D7429-347-98',ST January 4, 1999