Loading...
Mansions Phase 1-LR 990104 (6) Dallas/Fort Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-351 I Date of Observation 12/18/98 Report Date 1/04/99 To Western Rim Services Contractor Location SLAB AND GRADE BEAMS, BUILDING 12 - 15' EAST AND 10' SOUTH OF NORTHWEST CORNER Time Sampled 11:10 Time Batched 10:05 Weather Condition CLOUDY Concrete Temperature (OF) 58 Ambient Temperature (OF) 53 Mix Number 51 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.5 ENTRAINED AIR (%) 3.6 Concrete Cylinder Test(s) SpecimenI Age I Test Date l TOtal Load l Compressive No, (Days) (lbs.) Strength (psi) Strength Required (psi) 157A 7 12/25/98 79000 2790 3000/28 DAYS B 28 1/1 5/99 C 28 1/15/99 D H Curing Method I TestMethod I Standard 6" x12" I Engineer/TechnicianS. CORLEY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, AET ~w.) Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr, Larry Davis; City of Coppell (1) Mr, Mike Hodge; City of Coppell (1) Mr, Tony Martin; Newport Classic (1) Mr. Doyle Damron; C, D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or cond~ions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are- addressed. c:',wpwin\reports',D7429-351-98\ST January 4, 1999