Loading...
Mansions Phase 1-LR 990104 (7) Dallas/Fort Wodr~ Dallas, Texas Metro (972) 263-15u5 i 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-351 I Date of Observation 12/18/98 Report Date 1/04/99 To Western Rim Services Contractor SupplierLATTIMORE IPlant14 ITruck776 I Ticket14083218 Location SLAB AND GRADE BEAMS, BUILDING 12 - 15' EAST AND 10' SOUTH OF NORTHWEST CORNER Time Sampled 11:10 Time Batched 10:05 Weather Condition CLOUDY Concrete Temperature (OF) 58 Ambient Temperature (OF) 53 Mix Number 51 Mix Description Unit Weight Water Added'NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.5 ENTRAINED AIR (%) 3.6 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 157A 7 12/25/98 79000 2790 3000/28 DAYS B 28 1/15/99 110000 3890 C 28 1/15/99 111000 3930 D H Curing Method Test Method Standard 6" x 12" Engineer/Technician S. CORLEY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, AET ~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Dayis; City of Coppell (1) Mr. Mike Hedge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction-Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-351-98\ST January 18, 1999