Mansions Phase 1-LR 981216I~one Engineers, Inc. 1't~-~4 Goodnight Lane Tel. (972) 241-451'z- RoneEnc ineers
Dallas,'Fort Worth Da~as. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
GENERAL REPORT
PROJECT: Mansions By The Lake
REPORT NO: 3137-D7429-343A REPORT DATE: December 16, 1998
CLIENT: Western Rim Services SERVICE DATE: December 15, 1998
REPORT OF: CANCELLATION
On this service date, Leo Ruiz, representing Rone Engineers, Inc., arrived on site at the above
referenced project to perform Concrete Inspection services. Upon arrival, the technician was
informed that this day's activities were cancelled.
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(i) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared baaed upon the specific samples provided for testing. We assume no responsibility.
for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions
over which we have no conn~oi. Our letters and reports are for the exclusive use of the clients to whom they are addressed.
c:'.wpwm~repons",D7429-343A-98'.ST December 16. 1998 ~'~ J'