Loading...
Mansions Phase 1-LR 981214 ~lone ~ng~neers, Inc. 1 ~'~4 Goodnight Lane Tel. (972) 241-45~, -~ RoneEnqineers i Oallas.-'Fcr~ WorZ, h Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-325 Date of Observation 11/06/98 Report Date 12/14/98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 6 I Truck 613 I Ticket 6084158 Location SLAB ON GRADE, BUILDING #16 - 10' NORTH BY 5' EAST FROM SOUTHWEST CORNER OF SLAB Time Sampled 2:12 Time Bitched 1:17 Weather Condition CLOUDY Concrete Temperature {°F) 60 Ambient Temperature (°F) 58 Mix Number 51 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 3/4 ENTRAINED AIR (%) 5.0 Concrete Cylinder Test(s) Specimen I Age I Test Date l Total Load Compressive No. (Days) (lbs.) Strength (psi) Strength Required (psi) 146A 7 11/13 99500 3520 3000/28 DAYS B 28 12/04 131500 4650 C 28 12/04 1 24000 4390 D H Curing Method I Test Method Standard 6" x 12" Engineer/Technician J. BOSTER Area sq. ASTM C 31 I ASTM C 39,,~ 28.27 in. Signature: Mike Fuller, AET//~) Supervisor, CMT Remarks and/or Distribution~,,~ Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-325-98\ST December 14, 1998