Loading...
Mansions Phase 1-LR 981211 Dallas/For: Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansions By The Lake Page I of 1 Report No: 3137-D7429-343 Sample Date: December 8, 1998 Client: Western Rim Services Report Date: December 11, 1998 Location: Builiding #11 Technician: T. Duke # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 1 B-29 EAST SIDE 33K 2 1/8 --- NO"" 2 S-29 EAST SIDE 33K 2 1/8 --- NO** 8 B-32 NORTH SIDE 33K 2 3/8 --- NO*' 39 S-32 NORTH SIDE 33K 2 3/8 2 3/8 YES 18 S-65 EAST SIDE 33K 5 NO** BLDG. 36 Equipment ID: Ram No: * Pump No: * Gauge No: * Equipment Calibration Date: Commems: *Cable was placed before Lab tech arrived on site. **Cables #1 & #2 have a/c pad in front of them and was cut and grouted. #8 is cut & grouted. Building B-6 #18 was cut & grouted. Distribution: (1) Mr. Richard E. Simmons; Western Rim Serx'ices (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. ~ c:\~pwin\reports\D-98\ST December 11. 1998