ELONGATION REPORT
Project: Mansions By The Lake Page I of 1
Report No: 3137-D7429-343 Sample Date: December 8, 1998
Client: Western Rim Services Report Date: December 11, 1998
Location: Builiding #11 Technician: T. Duke
# Tendon Location Jack Force Gauge Required Elongations Elongations Total Within
No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance
1 B-29 EAST SIDE 33K 2 1/8 --- NO""
2 S-29 EAST SIDE 33K 2 1/8 --- NO**
8 B-32 NORTH SIDE 33K 2 3/8 --- NO*'
39 S-32 NORTH SIDE 33K 2 3/8 2 3/8 YES
18 S-65 EAST SIDE 33K 5 NO**
BLDG. 36
Equipment ID: Ram No: * Pump No: * Gauge No: *
Equipment Calibration Date:
Commems: *Cable was placed before Lab tech arrived on site. **Cables #1 & #2 have a/c pad in front of them and was cut and
grouted. #8 is cut & grouted. Building B-6 #18 was cut & grouted.
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Serx'ices
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed. ~
c:\~pwin\reports\D-98\ST December 11. 1998