Loading...
Mansions Phase 1-LR 981209'i'~,~,,-,~: ~-n~jin~r=.. ~,nr... ', .... "~4 ~Onigtll Lane T~. .~,: as rc-: wc'~n Dallas. Texas Metro t~,7z.; 263-1555 75229 Fax [972) 241-5174 GENERAL REPORT PROJECT: Mansions By The Lake REPORT NO' 3137-D7429-342 REPORT DATE: December 9, 1998 CLIENT: Western Rim Services SERVICE DATE: December 3, 1998 REPORT OF: CANCELLATION On this service date, Rhett Lovelady, representing Rone Engineers, Inc., arrived on site at the above referenced project to perform Concrete Inspection services. Upon arrival, the technician was informed that this day's activities were cancelled. Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; CiD, of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibili~' for variation in qualiq' (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. ~ c:'--.,.~win'.repo~s~D7429-342-95'.ST December 9. :998