Mansions Phase 1-LR 981202 ~on~ l~n~jln~r~, In~. 1 *~'~4 ~oodnight Lane '-Tel. (972) 241-451'z--
Dallas,'Fort Worth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-338 I Date of Observation 11/24/98 Report Date 12/02/98
To Western Rim Services
Contractor
Supplier LATTIMORE Plant 7 I Truck 812 I Ticket 7062120
Location PAVING - 20' EAST, 5' SOUTH FROM SOUTHEAST CORNER OF BUILDING //1 5
Time Sampled 7:00 Time Batched 6:15 Weather Condition CLOUDY
Concrete Temperature (°F) 65 Ambient Temperature (°F) 59 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 1/2
ENTRAINED AIR (%) 3.5
Concrete Cylinder Test(s)
Specimen J Age J Test Date J Total Load J Compressive
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
151A 7 12/01 70000 2480 3000/28 DAYS
B 28 12/22 93000 3290
C 28 12/22 95500 3380
D H
Curing MethodI
Test Method J Standard 6" x 12"
ASTM C 31 I ASTM C 39/~Area 28.27 sq. in. I Engineer/Technician R. LOVELADY
Signature: Mike Fuller, ALT L~.Supervisor, CMT
Remarks and/or Distribution '~
Distribution:
(1) Mr, Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr, Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D, Construction Consulting
(1)
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are'
addressed.
..
c:\wpwin\reports\D7429-338-98\ST January 4, 1999