Mansions Phase 1-LR 981202 (2) [:.al ~:s-~-.:;.~ ','-,'on,- Dallas. Texas Ib.utro (972) 263-i 555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-318 I Date of Observation 11i03.'98 Report Date 12..'02..'98
To Western Rim Services
Contractor
Supplier LATTIMORE I Plant 7 Truck 786 I Ticket 7061005
I
I
Location PAVING . NORTH SIDE OF BUILDING ,/30 - 15' WEST, 10' NORTH FROM NORTHWEST CORNER OF BUILDLHG
Time Sampled 9:45 Time Batched 9:00 Weather Condition PT CLOUDY
Concrete Temperature (~F) 68 Ambient Temperature (°F) 57 Mix Number 61
Mix Description Unit Weight Water Added 15 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5.0
ENTRAINED AIR (%) 3.2
Concrete Cvlinder Test(s)
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
142A 7 11 .."10 72000 2550 3000."28 DAYS
B 28 12/01 108000 3820
C 28 12.-'01 103000 3640
D H
Curing Method I Test Method I Standard 6" x 12" Engineer/Technician R. LOVELADY
Area 28.27 sa.
ASTM C 31 I ASTM C 39/~. . in.
Signature: Mike Fuller, AET (\,.,,)Supervisor, CMT
Remarks and/or Distribution ~'
Distribution:
1 Mr. Richard E. Simmons; Western Rim Services
1 Mr. Larry Davis; City of Coppell
1 Mr. Mike Hedge; City of Coppell
1 Mr. Tony Martin; Newport Classic
1 Mr. Doyle Damron; C. D. Construction Consulting
LiM; [ATICNS: The test results presented hereto were prepared based upon the speofic samples provided for test:n3. ~'-'e assume no
respons~bd¢.¥, for variation in quality (composition, appearance, performance, etc.) or any other feature of simi!ar subject matter prowded by
persons or conditions over which ;,.'e I~...1,.e P.o control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:v.'-,'pv,~n' reportstD7429-318-98'..ST November 13, 1998