Loading...
Mansions Phase 1-LR 981130 (2) ~or~e EnGineers. In<::. "--=-' 3_?~4 Goodr~,ght L~,r~e '~.e( ~97P--i 241-4~'''''= ineers " re- ,',3'~'~ 263-15~5 ca,i,,s F.:~: ',',c.-::~ Dallas, Texas :'..':et. ¢ ~,, ~-; 75229 Fax (972') 24i-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-308 Date of Observation 10/27/98 Report Date 11/30..'98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 7 I Truck 947 Ticket 7060631 L,,}cation PAVING - 75' SOUTH, 10' WEST FROM NORTHWEST CORNER OF BUILDING #24 Time Sampled 1:10 Time Batched 11:57 Weather Condition PT CLOUDY Concrete Temperature (S'F) 76 Ambient Temperature I°F) 79 Mix Number 61 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 ENTRAINED AIR (%) 4.1 Concrete Cylinder Test(s) I I I T°tal L°ad IC°mpressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required Ipsi) 1 36A 7 11/03 76000 2690 3000:28 DAYS B 28 11,."24 102000 3610 C 28 11/24 100000 3540 D H I Curing Method I Test Method Standard 6" x 12" Engineer/Technician S. SPARKMAN ASTM C 31 I ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, AET ~(~ S~Jpervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1~ Mr. Mille Hodge; City of Coppell (1~ Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific sarnl;Jes provided for testing. \~.'e assume no respg.",s,bi;ity for variation in qua;It¥, (composer,on, appearance, performance, eJc.) or an,/otner feature or sim,lar subject matter prowded by persor, s or con~d~on$ over which we have no control. OL:r le~ters and reports ara for the exclusive use of the clients to whom they are a~:dressed. ,':.:. ,',-;.';..'f reports .D7429-3CB-gB'-.ST t.,'o,..ember 30, 1998