Mansions Phase 1-LR 981130 (2) ~or~e EnGineers. In<::. "--=-' 3_?~4 Goodr~,ght L~,r~e '~.e( ~97P--i 241-4~'''''= ineers
" re- ,',3'~'~ 263-15~5
ca,i,,s F.:~: ',',c.-::~ Dallas, Texas :'..':et. ¢ ~,, ~-;
75229 Fax (972') 24i-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-308 Date of Observation 10/27/98 Report Date 11/30..'98
To Western Rim Services
Contractor
Supplier LATTIMORE I Plant 7 I Truck 947 Ticket 7060631
L,,}cation PAVING - 75' SOUTH, 10' WEST FROM NORTHWEST CORNER OF BUILDING #24
Time Sampled 1:10 Time Batched 11:57 Weather Condition PT CLOUDY
Concrete Temperature (S'F) 76 Ambient Temperature I°F) 79 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 1/2
ENTRAINED AIR (%) 4.1
Concrete Cylinder Test(s)
I I I T°tal L°ad IC°mpressive
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required Ipsi)
1 36A 7 11/03 76000 2690 3000:28 DAYS
B 28 11,."24 102000 3610
C 28 11/24 100000 3540
D H
I
Curing Method I Test Method Standard 6" x 12" Engineer/Technician S. SPARKMAN
ASTM C 31 I ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, AET ~(~ S~Jpervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1~ Mr. Mille Hodge; City of Coppell
(1~ Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific sarnl;Jes provided for testing. \~.'e assume no
respg.",s,bi;ity for variation in qua;It¥, (composer,on, appearance, performance, eJc.) or an,/otner feature or sim,lar subject matter prowded by
persor, s or con~d~on$ over which we have no control. OL:r le~ters and reports ara for the exclusive use of the clients to whom they are
a~:dressed.
,':.:. ,',-;.';..'f reports .D7429-3CB-gB'-.ST t.,'o,..ember 30, 1998