Mansions Phase 1-LR 981130 (4) ' , RoneEn ineers
%%,ru [972': 263-1555
2ahas ~:.::.'~ ~".~'orp, Dallas. Texas ' ~ ~ , .
75P29 ~ Fax ~aTp' 241-5~ ~''
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-311 I Date of Observation 10/28/98 Report Date 11/30/'98
To Western Rim Services
Contractor
Supplier LATTIMORE ] Plant 7 ] Truck 757 I Ticket 7060664
Location PAVING - 15' WEST, 20' NORTH FROM SOUTHWEST CORNER OF BUILDING #19
Time Sampled 4:07 Time Batched 2:45 Weather Condition PT CLOUDY
Concrete Temperature (CF) 74 Ambient Temperature (:FI 65 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 1/2
ENTRAINED AIR I%) 1.5
Concrete Cylinder Test(s)
II ]Tota' Load I Compress've
No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi)
1 38A 7 11/04 81000 2870 3000/28 DAYS
B 28 I 1/25 108000 3820
C 28 11/25 105000 3710
D H
Signature: Mike Fuller, AET (\.N)Supervisor, CMT
Remarks and/or Distribution
CONTRACTOR INFORMED OF LOW AIR CONTENT
Distribution: (1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hedge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
:_I?'.'.',TAT.O;'Je: ; r,e test resJ [s i)resea'.ed herein, -,'..ere prepared b-osed upon the 5pecihc setup,es prcv,dea for tes'.i~'g. We ass.;me Po
'esp'-or~s.bi'iL¥ tot ',-~'i;.~:icp ir, q.lL:,l;y Jcomposition, aj.'.¢,e-orer'ce, pe'fcrmanse, etc.! cr ar,',' other feature oi s~mi~ar 5ub.,ect ma::er prov,de.'.l L,-,'
c: -.'.';;-.':,c(reF:;r:s D',"-:2~.-31 i 9~'$T .~-Jove~T'ber ~ 1, 1998