Mansions Phase 1-LR 981125 ......... - _ ..=. one nnineers
D~ ~ F::.r: '."~c:-d'~ Dallas. Texas Metro (972~ 263-1555 ~~
75229 ~ Fax (972) 24i -5i74
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-300 I Date of Observation 10.'23.'98 Report Date 11.'25.'98
To Western Rim Services
Contractor
Supplier LATTIMORE I Plant 6 I Truck 808 I Ticket 6082963
Location PAVING, BUILDING PAD #22 - 20' NORTH, 5' EAST FROM NORTHWEST CORNER OF BUILDING
Time Sampled 7:15 Time Batched 6:00 Weather Condition PT CLOUDY
Concrete Temperature (cF) 63 Ambient Temperature (OF) 46 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP {in.) 6 1..'2
ENTRAINED AIR (%) 3.1
Concrete Cylinder Test(s)
Specimen I AgeI ITotalLoad Compressive
No. (Days) Test Date (lbs.) Strength (psi) Strength Required fpsi)
131A 7 10/30 69000 2440 3000/28 DAYS
B 28 I 1/20 106000 3750
C 28 11/20 102000 3610
D H
I
Curing Method I Test Method I Standard 6"x 12" I Engineer/Technician R. LOVELADY
ASTM C 31 I ASTM C 39 i Area 28.27 sq. in.
I
Signature: Mike Fuller, AET Supervisor, CMT ~
Remarks and."or Distribution
Distribution:
tl) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hedge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
-IMITAT'.Or,S; The test results [:resented hr;re n were prepared based upon the spesif:c samp;es provided for [estm, g, We a55Jrr:e no
r85~)o:tsi~. J:?r fo: '.'~.r~atiol: ,n qual:t,/ ;cornpos.t,on, appearer, oe, performance, etc.) or any other feature of sim;lar subject ma:~'er pro'.'~ded
pt)rs(;q5 C' COlldit[on5 over ;',hich ','.'e na..e "~o cae[rah Cur letters and reports are for tqe eXCJd$iVe use of tr, e c!ien[s to whom the.,, ~re
~ddress~.c.
c: ¢;:%'.m.re::::rts.D7429-3C3.9~ ST tJakemt:er 13. 199'3