Mansions Phase 1-LR 981119 (3) '~ -~'-~,~ o,o~a,,igm Lane Te~. (~72) 24'1-45~ -- RoneEnQineers
Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-332 I Date of Observation 11/12~98 Report Date 11/19/98
To Western Rim Services
Contractor
Location PAVING - 30' EAST, 50' NORTH FROM SOUTHEAST CORNER OF BUILDING //33
Time Sampled 9:36 Time Batched 8:36 Weather Condition CLOUDY
Concrete Temperature {°F) 62 Ambient Temperature (°F) 54 Mix Number 61
Mix Description Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5.0
ENTRAINED AIR (%) 3.4
Concrete Cylinder Test(s)
No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi)
149A 7 11/19 90000 3180 3000/28 DAYS
B 28 12/10
C 28 12/10
D H
Curing Method I Test Method Standard 6" x 12" Engineer/Technician S. SPARKMAN
ASTM C 31 ] ASTM C 39/~ Area 28.27 sq. in.
Signature: Mike Fuller, AET ~! Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hedge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented hereto were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to w'hom the,/ are
addressed.
c:'.wpwin'..reports',D7429-332-98'.ST November 19, 1998