Loading...
Mansions Phase 1-LR 981119 (4) Dallas 'For:. WoC,,n Dallas. Texas Metro (972) 263-1555 i 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-333 I Date of Observation 11/12/98 Report Date 11/19/98 To Western Rim Services Contractor Supplier LATTIMORE Plant 7 I Truck 451 I Ticket 7061571 Location PAVING - 25' WEST, 15' NORTH FROM NORTHEAST CORNER OF BUILDING #33 Time Sampled 11:42 Time Batched 11:13 Weather Condition CLOUDY Concrete Temperature {°F) 62 Ambient Temperature (°F) 56 Mix Number 61 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/4 ENTRAINED AIR (%) 3.2 Concrete Cylinder Test{s) SpecimenI Age [ Test Date l TOtal Load l Compressive No. (Days) {lbs.) Strength {psi) Strength Required (psi) 150A 7 11/19 105000 3710 3000/28 DAYS B 28 12/10 C 28 12/10 D H I I Curing Method I Test Method Standard 6" x 12" I Engineer/Technician S. SPARKMAN ASTM C 31 ~ ASTM C 39,, Area 28.27 sq. in. I I \ Mike Fuller, AET ~ Supervisor, CMT Signature: Remarks and/or Distribution ~ Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented hereto were prepared based upon the specific samples prowded for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter prowded by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the chents to whom they are addressed. c:..wpwin'.reports\D7429-333-98',.ST November 19, 1998