Mansions Phase 1-LR 981119 (4) Dallas 'For:. WoC,,n Dallas. Texas Metro (972) 263-1555
i 75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-333 I Date of Observation 11/12/98 Report Date 11/19/98
To Western Rim Services
Contractor
Supplier LATTIMORE Plant 7 I Truck 451 I Ticket 7061571
Location PAVING - 25' WEST, 15' NORTH FROM NORTHEAST CORNER OF BUILDING #33
Time Sampled 11:42 Time Batched 11:13 Weather Condition CLOUDY
Concrete Temperature {°F) 62 Ambient Temperature (°F) 56 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 1/4
ENTRAINED AIR (%) 3.2
Concrete Cylinder Test{s)
SpecimenI Age [ Test Date l TOtal Load l Compressive
No. (Days) {lbs.) Strength {psi) Strength Required (psi)
150A 7 11/19 105000 3710 3000/28 DAYS
B 28 12/10
C 28 12/10
D H
I
I
Curing Method I Test Method Standard 6" x 12" I Engineer/Technician S. SPARKMAN
ASTM C 31 ~ ASTM C 39,, Area 28.27 sq. in.
I
I \
Mike Fuller, AET ~ Supervisor, CMT
Signature:
Remarks and/or Distribution ~
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented hereto were prepared based upon the specific samples prowded for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter prowded by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the chents to whom they are
addressed.
c:..wpwin'.reports\D7429-333-98',.ST November 19, 1998