Loading...
Mansions Phase 1-LR 981119 (5) ,one t~ng,neers, Inc. , ..... 54 C~ooOn,gh! Lane Tel. (~',2~ RoneEnaineers i Dal,as For: Wor!h Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-331 Date of Observation 1 1/12/98 Report Date 1 1/19/98 To Western Rim Services Contractor Location PAVING - 15' EAST, 25' NORTH FROM SOUTHEAST CORNER OF BUILDING //33 Time Sampled 7:32 Time Batched 6:40 Weather Condition CLOUDY Concrete Temperature (°F) 60 Ambient Temperature (°F) 55 Mix Number 61 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 3 1/2 ENTRAINED AIR (%) 3.7 Concrete Cylinder Test(s) No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 148A 7 11/19 101000 3570 3000/28 DAYS B 28 12/10 C 28 1 2/10 D H I Curing Method J Test Method Standard 6" x 12" I Engineer/Technician S. SPARKMAN ASTMC31I ASTMC39~ Area 28.27 sq. in. I Signature: Mike Fuller, AET /i~)Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hedge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibihty for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are I'or the exclusive use of the clients to whom they are addressed. c:-.wpwin'.reports\D7429-331-98~ST November 19, 1998