Loading...
Mansions Phase 1-LR 981119 (6) :: .one l~nc~ineers, Inc. I ~-~34 ~oodnight Lane Tel. RoneEn ineers Da~as Fort Wor1, n Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-329 IDate°fObservati°n 11/11/98 Report Date 11/19/98 To Western Rim Services Contractor Location PAVING - 20' WEST, 35' NORTH FROM SOUTHWEST CORNER OF BUILDING #32 Time Sampled 9:56 Time Batched 8:56 Weather Condition CLEAR Concrete Temperature (°F) 60 Ambient Temperature i°F) 55 Mix Number 61 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 Concrete Cylinder Test(s) No. . (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 147A 7 11/18 82000 2900 3000/28 DAYS B 28 12/09 C 28 12/09 D H I I Curing Method I Test Method I Standard 6" x 12" Engineer/Technician S. SPARKMAN ASTMC31 ~ ASTMC39 ~ Area 28.27 sq. in. Signature: Mike Fuller, AET /~k~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specihc samples provided for testing. We assume no responsibility for vanation in quality Icomposition, appearance, performance, etc.) or any other i'eature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:'.wpwm'.reports;D7429-329-98'.ST November 19. 1998