Loading...
Mansions Phase 1-LR 981118 ,o.e RoneEngineers Pa,as For, Wo~,~ Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 GENERAL REPORT Project Mansions By The Lake Number 3137-D7429-334 ICollection Date 11,13/98 IReport Date 11,18,98 To Western Rim Services Report of CYLINDER COLLECTION Identification Method of Test Results: On this collection date, Shane Sparkman, representing Rone Engineers, Inc., arrived on site at the above referenced project to collect concrete cylinders made on November 1 2, 1998, for curing and compressive strength testing. Distribution: (1) Mr. Richard E, Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presemed herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in qoality ~comlx~sition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. /~,. c:'..wpwin'~.reports'..D7429-334-98',.ST November 18, 1998