Mansions Phase 1-LR 981118 ,o.e RoneEngineers
Pa,as For, Wo~,~ Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
GENERAL REPORT
Project Mansions By The Lake
Number 3137-D7429-334 ICollection Date 11,13/98 IReport Date 11,18,98
To Western Rim Services
Report of CYLINDER COLLECTION
Identification
Method of Test
Results:
On this collection date, Shane Sparkman, representing Rone Engineers, Inc., arrived on site at the above
referenced project to collect concrete cylinders made on November 1 2, 1998, for curing and compressive
strength testing.
Distribution: (1) Mr. Richard E, Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presemed herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in qoality
~comlx~sition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters
and reports are for the exclusive use of the clients to whom they are addressed.
/~,.
c:'..wpwin'~.reports'..D7429-334-98',.ST November 18, 1998