Loading...
Mansions Phase 1-LR 981117 Ro.e Engi.eef¢. Ind. 119_-14 Goodnlght L2ne Tel. (:972} 24',.--45; 7- RoneEngineers Da~.as.-Fo¢. Worn Dahas. Texas rvle-'.ro (972) 263-15~.d 75229 Fax ,-QT~ 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-291 Date of Observation 10/16i98 Report Date 11.,,'17/98 To Western Rim Services Contractor Supplier LATTIMORE Plant 6 I Truck 615 I Ticket 6082633 I I Location SLAB ON GRADE, BUILDING //33 - 30' EAST, 20' SOUTH FROM NORTHWEST CORNER OF BUILDING Time Sampled 9:00 Time Batched N/A Weather Condition CLOUDY Concrete Temperature (OF) 77 Ambient Temperature (°F) 74 Mix Number 51 Mix Description Unit Weight Water Added 5 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 Concrete Cylinder Test(s) No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 128A 7 10/23 68000 2410 3000/28 DAYS B 28 11/13 83000 2940' C 28 11/13 84000 2970* D 56 12/11 I Curing Method I Test Method! Standard 6" x 12" I Engineer/Technician R. LOVELADY ASTM C 31 I ASTM C 39._[ Area 28.27 sq. in. I Signature: Mike Fuller, AET (~J Supervisor, CMT Remarks and/or Distribution *DID NOT MEET REQUIRED STRENGTH, WILL TEST HOLD CYLINDER AT 56 DAY BREAK Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc. J or any other feature of s~mdar subject matter provided by persons or conditions over wh,ch we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:'.wpwin'.reports',D7429-291-98'.ST November 17, 1998