Mansions Phase 1-LR 981116 ca. as,~-~... ',.':c~h Dalias. Texas Metre ~'Q72'~ £33¢"' *- 1;5;~ ~'
75229 Fax (972) 241-5i 74
Concrete Cylinder Test Report
Project Mansions By lhe Lake Purchase Order
Number 3137-D7429-322 I Date of Observation 11.,.'0§/98 Report Date 11..'16,'98
To Western Rim Services
Contractor
Location PAVING, APPROACH ON WEST SIDE OF BUILDING //32 - 20' SOUTH, 15' WEST FROM NORTHWEST CORNER OF
BUILDING
Time Sampled 11:00 Time Batched 9:45 Weather Condition PT CLOUDY
Concrete Temperature (°F) 62 Ambient Temperature (°F) 49 Mix Number 61
Mix Description Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4 1/2
ENTRAINED AIR (%) 3.1
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (ps)
143A 7 11/12 89000 3150 3000/28 DAYS
B 28 12/03 110000 3890
C 28 12/03 115000 4070
D H
Curing Method I Test Methodl Standard 6" x12" I Engineer/TechnicianR. LOVELADY
ASTM C 31 ASTM C 39~/~Area 28.27 sq. in.
Signature: Mike Fuiier, AET ~l~JSupervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hedge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of s~m~lar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:'.wpwm~.reports'.D7429-322-98'.ST November 16, 1998