Mansions Phase 1-LR 981113 Dallas. Fort Wo'I,r~ Da.as. Texas Metro (972) 263-15~5
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-284 I Date of Observation 10/14/98 Report Date 11/13/98
To Western Rim Services
Contractor
Location BUILDING PAD #15, 5' NORTH, 10' EAST FROM SOUTHWEST CORNER OF BUILDING PAD
Time Sampled 7:10 Time Batched 6:40 Weather Condition PT CLOUDY
Concrete Temperature {OF) 74 Ambient Temperature (OF) 57 Mix Number 51
Mix Description Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4.0
Concrete Cylinder Test(s)
No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi)
123A 7 10/21 78000 2760 3000/28 DAYS
B 28 11/11 91000 3220
C 28 11/11 98000 3470
D H
Curing Method I Test Method I Standard 6" x 12"
ASTM C 31 I ASTM C 39 ./~Area 28.27 sq. in. I Engineer/Technician R. LOVELADY
Signature: Mike Fuller, AET I?Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin~reports\D7429-284-98\ST November 13, 1998