Loading...
Mansions Phase 1-LR 981113 Dallas. Fort Wo'I,r~ Da.as. Texas Metro (972) 263-15~5 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-284 I Date of Observation 10/14/98 Report Date 11/13/98 To Western Rim Services Contractor Location BUILDING PAD #15, 5' NORTH, 10' EAST FROM SOUTHWEST CORNER OF BUILDING PAD Time Sampled 7:10 Time Batched 6:40 Weather Condition PT CLOUDY Concrete Temperature {OF) 74 Ambient Temperature (OF) 57 Mix Number 51 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4.0 Concrete Cylinder Test(s) No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 123A 7 10/21 78000 2760 3000/28 DAYS B 28 11/11 91000 3220 C 28 11/11 98000 3470 D H Curing Method I Test Method I Standard 6" x 12" ASTM C 31 I ASTM C 39 ./~Area 28.27 sq. in. I Engineer/Technician R. LOVELADY Signature: Mike Fuller, AET I?Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin~reports\D7429-284-98\ST November 13, 1998