Mansions Phase 1-LR 981113 (3) .~.1,,?.5 For: W ..... Dailas. Texas I ..... o (972) 263-!555
75229 Fax (972'! 241-5174
Concrete Cylinder Test Report
Project Mansions ByThe Lake Purchase Order
Number 3137-D7429-317 IDate°f Observation 11."03/98 Report Date 11.'13.'98
To Western Rim Services
Contractor
Supplier LATTIMORE Plant 7 I Truck458 I Ticket 7060993
I
I
Location PAVING, NORTH SIDE OF BU'ILDING //30 - 25' WEST, 5' NORTH FROM NORTHEAST CORNER OF BUILDING
Time Sampled 8:15 Time Batched 7:25 Weather Condition PT CLOUDY
Concrete Temperature (CF) 66 Ambient Temperature (C'F) 52 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP fin.) 7 1/2
ENTRAINED AIR (%) 3.1
Concrete Cylinder Test(s)
No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi)
141A 7 11/10 60000 2120 3000/28 DAYS
B 28 12/01 93000 3290
C 28 12/01 94000 3330
D H
I
Curing Method I Test Method Standard 6" x 12" I Engineer/Technician R. LOVELADY
ASTM C 31 I ASTM C 39 Area 28.27 sq. in.
I
Signature: Mike Fuller, AET/~Supervisor,-- CMT
I -
Remarks and..'or Distribution ~--_
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hedge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
_!.Mi ;'A r~o:JE. T:~e tus: ;usu is [:,resent. ed hereiJl were prep&rea bEse:~ upcn the 5pecd~c s~mpl&s pr3~"c~c for testi:;9. ?,'e ass,.m5 re
res;;cps,giJ:;'r' fc~ v~riEt.o~ in qu~!.t? Icomposi:ion. appear~n;e, perlcrmarce, etc. J or an',- o;her festure of s.ml ar 5J[;-;e.:;t ¢,3;[er prcu, de:: b-,'
c .'.~: .-.i:' :~pc':s B~-129 3 ~ 7.9S 5- N;--¢,~t:~r ' 3. : 998