Loading...
Mansions Phase 1-LR 981113 (6) ,o,,e {2n~j;neers. {ne. ~ ~.~3~. Goodnight Lane Tei. (g72! 241-45 ~ 7__ Rone En_qineers Cahas..Fo-, Wc.n.h Da.as. Texas Metro (972) 263-15~5 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-317 I Date of Observation 11/03/98 Report Date 11/13/98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 7 I Truck 458 I Ticket 70G0993 Location PAVING, NORTH SIDE OF BUILDING #30 - 25' WEST, 5' NORTH FROM NORTHEAST CORNER OF BUILDING Time Sampled 8:15 Time Batched 7:2.5 Weather Condition PT CLOUDY Concrete Temperature {°F) 66 Ambient Temperature (°F) 52 Mix Number 61 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 7 1/2 ENTRAINED AIR (%) 3.1 Concrete Cylinder Test(s) No. (Days) (lbs.) Strength (psi) Strength Required {psi) 141A 7 11/10 60000 2120 3000/28 DAYS B 28 12/01 C 28 12/01 D H Curing Method I Test MethodI Standard 6" x 12" Engineer/Technician R. LOVELADY ASTM C 31 I ASTM C 39/~ Area 28.27 sq. in. Signature: Mike Fuller, AET(!~ Supervisor, CMT Remarks and/or Distribution ~ Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin',,reports\D7429-317-98\ST November 13, 1998