Loading...
Mansions Phase 1-LR 981112 (2) R E gi Dadas. FC~ Woc~ Da~as. Texas Metro (972) 263-i bo5 ~, 75229 Fax (972) 241-5174 REPORT OF FIELD INSPECTION OF CONCRETE TESTED FOR: Western Rim Services PROJECT: Mansions By The Lake DATE: November 12, 1998 OUR REPORT NO.: 3137-D7429-330 FIELD DATA: No of Concrete Water Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Yards of Added Slump Content Temp Temp No Made Number Loaded Sampled Concrete (Gal) (In) (%) °F °F 148 4 6084480 6:40 7:32 10 10 3 1/2 3.7 55 60 149 4 6084495 8:36 9:36 10 10 5 3.4 54 62 150 4 7061571 11:13 11:42 10 0 5 1/4 3.2 56 62 LOCATION: 148 PAVING - 15' EAST, 25' NORTH FROM SOUTHEAST CORNER OF BUILDING #33 149 PAVING - 30' EAST, 50' NORTH FROM SOUTHEAST CORNER OF BUILDING #33 150 PAVING - 25' WEST, 15' NORTH FROM NORTHEAST CORNER OF BUILDING #33 REMARKS: TECHNICIAN: S. Sparkman DISTRIBUTION: {1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell {1) Mr. Mike Hodge; City of Coppell {1) Mr. Tony Martin; Newport Classic {1) Mr. Doyle Damron; C. D. Construction Consulting [r Mike CMT Supervisor Rone Engineers, Inc. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.} or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin'.reports~.D7429-330-98',.ST November 16, 1998