Loading...
Mansions Phase 1-LR 981111 (3) RoneEn, ineers Da~;as.'ror:. Wc.~.n Da.as. Texas Metro (972) 263-1 75229 Fax (972) 241-5174 REPORT OF FIELD INSPECTION OF CONCRETE TESTED FOR: Western Rim Services PROJECT: Mansions By The Lake DATE: November 11, 1998 OUR REPORT NO.: 3137-D7429-328 FIELD DATA: No of Concrete Water Air Ambient Concrete Set Cylinders Supplier Ticket Time Truck Time Yards of Added Slump Content Temp Temp No Made Number Loaded Sampled Concrete {Gal) {In) (%) °F °F 147 4 6084382 8:56 9:56 10 0 5 1/2 N/A 55 60 LOCATION: 147 PAVING - 20' WEST, 35' NORTH FROM SOUTHWEST CORNER OF BUILDING #32 REMARKS: TECHNICIAN: S, Sparkman DISTRIBUTION: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting F~r Mike CMT Supervisor Rone Engineers, Inc. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpw~n'.reports'.D7'~29-328-98\ST November 16, 1998