Loading...
Mansions Phase 1-LR 981110 noll~ P.-nyin~t~r,~, Inc;. I ....... ~4 r~oo~rllghl Lane 'Tel. Dallas?od Wor',n Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-305 [ Date of Observation 10/26/98 Report Date 11/10!98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 7 J Truck 944 Ticket 7060550 Location PAVING - 25' NORTH, 20' EAST OF SOUTHEAST CORNER OF BUILDING #18 Time Sampled 1:00 Time Batched 11:41 Weather Condition PT CLOUDY Concrete Temperature (°F) 76 Ambient Temperature (°F) 78 Mix Number 61 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4 1/2 ENTRAINED AIR (%) 3.3 Concrete Cylinder Test(s) No. (Days) (lbs.) Strength (psi) Strength Required (psi) 1 34A 7 11/02 73000 2580 3000/28 DAYS B 28 11/23 94000 3330 C 28 11/23 92000 3250 D H Curing Method I Test Method I Standard 6" x 12" Engineer/Technician R. LOVELADY ASTM C 31 I ASTM C 39 )-~Area 28.27 sq. in. Signature: Mike Fuller, AET /~'~Supervisor, CMT Remarks and/or Distribution ~ Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over whlch we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:"""pwin~-reports'.D7429-305-98',ST November 10, 1998