Loading...
Mansions Phase 1-LR 981110 (2) no,~ =-ein~r~, t,~. ~ ;'~, geod,~jht La,e TeL (c~72i 24~,-4517 - RoneEn_qineers Dailas.'Foc Worth Dallas. Texas Metro (972) 263-155~ i 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-304 r Date of Observation 10/26/98 Report Date 11/10/98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 7 I Truck 947 I Ticket 7060518 Location PAVING - 20' SOUTH, 15' EAST OF NORTHEAST CORNER OF BUILDING //18 Time Sampled 7:45 Time Batched 6:29 Weather Condition PT CLOUDY Concrete Temperature (°F) 72 Ambient Temperature (°F) 65 Mix Number 61 Mix Description Unit Weight Water Added 25 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.0 ENTRAINED AIR (%) 3.2 Concrete Cylinder Test(s) Specimen J AgeI ITotalLoadl Compressive No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 133A 7 11/02 80000 2830 3000/28 DAYS B 28 11/23 C 28 11/23 D H I Curing Method I Test Method Standard 6" x 12" Engineer/Technician R. LOVELADY ASTM C 31 I ASTM C 39 Area 28.27 sq. in. ,-, Signature: Mike Fuller, AET I/~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr, Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr, Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:'.wpwin",reports',D7429-304-98\ST November 10, 1998