Loading...
Mansions Phase 1-LR 981110 (3) I~e~e E~eji~eer~z. I.e. ~ 22_4 Goodr~i~ht Large TeL (g72) 241-45~7 _ RoneEn ineers Dallas. For Wodh Da~o~, Texas Metro (972) 263-1 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansions By The Lake Page 1 of 1 Report No: 3137-D7429-319 Sample Date: November 4, 1998 Client: Western Rim Services Report Date: November 10, 1998 Location: Building g7 Technician: R. Lovelady # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 58 S-67 5 114 59 B-67 5 1/4 60 S-67 5 1/4 61 S-15 South Side 33K 7800 I I 7/8 7/8 7/8 YES 62 S-59 4 5/8 63 S-27 2 I 5/8 1/4 1 7/8 YES 64 B-29.6 2 65 67 68 69 70 71 72 73 74 75 76 Equipment ID: Ram No: 38077 Pump No: 380005 Gauge No: 380005 Equipment Calibratioe Date: 9/25/98 Comments: Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quali~ (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are /f~ addressed. c:\~pwin\reports\D7429-319-98\ST November 10, 1998