Mansions Phase 1-LR 981109 Da~!as:Fort Wcr:.t~ Dallas. Texas Metro (972) 263-1
75229 Fax (972) 241-5174
ELONGATION REPORT
Project: Mansions By The Lake Page 1 of 1
Report No: 3137-D7429-314 Sample Date: October 30, 1998
Client: Western Rim Services Report Date: November 9, 1998
Location: Tennis Court/Restress Technician: K. Musmfa
Tendon Location Jack Force Gauge Required Elongations Elongations Total Within
No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance
S124-B WEST SIDE 33K 7600 9 5/8 8 11/16 3/8 9 1/16 YES
S124-B WEST SIDE 33K 7600 9 5/8 8 1/2 1/2 9 YES
Equipment ID: Ram No: 98-283 Pump No: 0390870 Gauge No: N/A
Equipment Calibration Date: 8/03/98
Comments: Restressed because they were not within the tolerance.
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no consol. Our letters and reports are for the exclusive use of the clients to whom they are ~
addressed.
c:\wpwin\reports\D7429-314-98~ST November 9, 1998