Loading...
Mansions Phase 1-LR 981109 (2) ..... RoneEn ineers [%~,;as F:>r: '¢.'::-:i' D~thas, Texas M:et:o,~,_,"3-~P' do.~-, goo-~- 75229 Fax ,a ,/, 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-301 Date of Observation 10,.'23,.'98 Report Date 11.:09.'98 To Western Rim Services Contractor Supplier LATTIMORE MATERIALS CO. [ Plant 6 I Truck 617 Ticket 6082974 Location PAVING - 10' SOUTH AND 10' EAST OFF NORTHEAST CORNER OF BUILDING PAD #23 Time Sampled 9:35 Time Batched 7:46 Weather Condition PT CLOUDY Concrete Temperature (CF) 74 Ambient Temperature {°F) 60 Mix Number 61 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 Concrete Cylinder Test(s) Specimen Age Test Date Ho. {.Days) (Us.) Strength (psi) Strength Required (psi) 132A 7 10/30 64000 2260 3000.-'28 DAYS B 28 11/20 106000 3750 C 28 11/20 105000 3710 D H Signature: Mike Fuller, AET Supervisor, CMT t}~ Remarks and'or Distribution Distribution: (1) Mr. Richard E. Sim.rnons; Western Rim Services (1) Mr. Larry Davis; City of Coppe~l (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting L;MITATiONS: The test results prese,",[a~ her~:::: were prepared based upon the specific 5am;;:es pro-.'id(;d for testing. ?Je as~.ime respcr, si."..i,t¢ Cot '..-ar;atiol~, in (]uahty {composition, appearance, performance, et'.;.) or any other feature of s;m,lar 5uoje.~t matte:' prov':led [;er$o;'~sor conditions over ,-,hich we have r:o control. Our letters and reports are for the exclusi~-eus~ of fha c;,ents to '.'.horn they are ~ddressea, c:'v.,.pv,,n .reports'D7429-301-98 .ST November 9, 1998