Loading...
Mansions Phase 1-LR 981109 (4) ~,~,~ ¢',,~i~,~_~,~. I~,~. '/172~ G~,"lni~ht l ~n,~ Tel./.972~ 24'~-45'~ 7 .- ineers Da,:as Foe Wc,'tn Dallas. Texas N. le'.ro (972) 263-155c 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-274 I Date of Observation 10/02/98 Report Date 11/09/98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 7 I Truck 755 I Ticket 7059481 Location SLAB ON GRADE, BUILDING//23 - 10' WEST, 5' SOUTH FROM NORTHEAST CORNER OF BUILDING Time Sampled 7:10 Time Batched 6:31 Weather Condition CLOUDY Concrete Temperature I°F) 79 Ambient Temperature (°F) 69 Mix Number 51 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4 1/2 Concrete Cylinder Test(s) Specimeni Age I Test Date I Total Load I Compressive No. (Days) (lbs.) Strength (psi) Strength Required (psi) 121A 7 10/09 85000 3010 3000/28 DAYS B 28 10/30 105000 3710 C 28 10/30 108500 3840 D H I I Curing Method I Test Method I Standard 6" x 12" Engineer/Technician R. LOVELADY ASTMC31I ASTMC39I Area 28.27 sq. in. Signature: Mike Fuller, AETI~'~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:",wpwin\reports\D7429-274-98\ST November 9, 1998