Loading...
Mansions Phase 1-LR 981105 (4) Rone Englneer~. Inc. 11~--~4 Goodnicjht Lane TeL (972_~ 2,4~-,-t5~7-- RoneEngineers -Da.las. For1 Worm Dallas. Texas Metro (97,-) ,-6o-1 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-309 Date of Observation 10/27/98 Report Date 11;'05~'98 To Western Rim Services Contractor Supp,er,ATTIMORE I Plant 3 I Truck I Ticket Location PAVING - 125' WEST, 75' NORTH FROM NORTHWEST CORNER OF BUILDING #1 Time Sampled 4:20 Time Batched 2:48 Weather Condition PT CLOUDY Concrete Temperature (OF) 76 Ambient Temperature (OF) 81 Mix Number 61 Mix Description Unit Weight Water Added 20 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6 1/2 ENTRAINED AIR (%) 4.3 Concrete Cylinder Test(s) Specimen I Age I Test Date I Tota~ Load I Compressive No. (Days) (lbs.) Strength (psi) Strength Required (psi) 137A 7 11/03 75000 2650 3000/28 DAYS B 28 11/24 C 28 11/24 D H Curing Method Test Method Standard 6" x 12" I Engineer/Technician S. SPARKMAN ASTM C 31 ASTM C 39 Area 28.27 sq. in. I Signature: Mike Fuller, AET Supervisor, CMT~ Remarks and/or Distribution 20 gallons of water added at pump. Superintendent was informed of time limit on concrete. Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein 'were prepared based upon the specific samples Grcvided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of simdar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:',wpwm\reports',D-98',ST November 5. 1998