Mansions Phase 1-LR 981105 (4) Rone Englneer~. Inc. 11~--~4 Goodnicjht Lane TeL (972_~ 2,4~-,-t5~7-- RoneEngineers
-Da.las. For1 Worm Dallas. Texas Metro (97,-) ,-6o-1
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-309 Date of Observation 10/27/98 Report Date 11;'05~'98
To Western Rim Services
Contractor
Supp,er,ATTIMORE I Plant 3 I Truck I Ticket
Location PAVING - 125' WEST, 75' NORTH FROM NORTHWEST CORNER OF BUILDING #1
Time Sampled 4:20 Time Batched 2:48 Weather Condition PT CLOUDY
Concrete Temperature (OF) 76 Ambient Temperature (OF) 81 Mix Number 61
Mix Description Unit Weight Water Added 20 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 6 1/2
ENTRAINED AIR (%) 4.3
Concrete Cylinder Test(s)
Specimen I Age I Test Date I Tota~ Load I Compressive
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
137A 7 11/03 75000 2650 3000/28 DAYS
B 28 11/24
C 28 11/24
D H
Curing Method Test Method Standard 6" x 12" I Engineer/Technician S. SPARKMAN
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
I
Signature: Mike Fuller, AET Supervisor, CMT~
Remarks and/or Distribution
20 gallons of water added at pump. Superintendent was informed of time limit on concrete.
Distribution: (1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein 'were prepared based upon the specific samples Grcvided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of simdar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:',wpwm\reports',D-98',ST November 5. 1998