Loading...
Mansions Phase 1-LR 981030 (3) rlon¢ ~-nglneer~. In~. ,1 .... ~ Oooon,gt~l LaneT~i. 4;-4s; .-..-. RoneEnaineers Cadas. F,.;.,~ W,.:,r?~ Dallas. Texas Metro (972) 263-1555 ~~ 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-233 I Date of Observation 9/03/98 Report Date 10/30/98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 6 I Truck 803 I Ticket 6079498 Location BUILDING PAD #19, 5' WEST, 10' NORTH FROM SOUTHEAST CORNER OF BUILDING Time Sampled 9:10 Time Batched N/A Weather Condition CLEAR Concrete Temperature (°F) 86 Ambient Temperature (°F) 81 Mix Number 61 Mix Description Unit Weight Water Added 5 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 Concrete Cylinder Test(s) No. (Days) (lbs.) Strength (psi) Strength Required (psi) 103A 7 9/110 51000 1800 3000/28 DAYS B 28 10/01 66000 2330 C 28 10/01 70000 2480 D 56 10/29 94000 3330 Curing Method Test Method Standard 6" x 12" Engineer/Technician R. LOVELADY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, AET Supervisor, CUTj~Jl Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting L!MITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume nc responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:".wowin'.re[~orts\D7429-233-98'.S- October 30, 1998