Mansions Phase 1-LR 981030 (5) ". RoneEnaineers
Da~=as. Fc,~ Wo~ Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-271 I Date of Observation 10/01/98 Report Date 10/30/98
To Western Rim Services
Contractor
Location SLAB ON GRADE, BUILDING //3 - 30' WEST, 10' SOUTH FROM NORTHEAST OF BUILDING
Time Sampled 8:50 Time Batched 8:30 Weather Condition PT CLOUDY
Concrete Temperature (°F) 83 Ambient Temperature (°F) 79 Mix Number 51
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 1/2
Concrete Cylinder Test(s)
Specimen r AgeI I Total Load I Compressive
No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi)
119A 7 10/08 77000 2720 3000/28 DAYS
B 28 10/29 94500 3340
C 28 10/29 103000 3640
D H
Curing Method I Test Method Standard 6" x 12" Engineer/Technician R. LOVELADY
ASTM C 31 I ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, AET Supervisor, CMT~-
L
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
J
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.} or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:'.wpwin;reports\D7429-271-98'.ST C'c~ccer 3C, ", 998