Loading...
Mansions Phase 1-LR 981028 (3) ~,,.,,, ,~.~,~.~,,a~,~_ In~_. f f ~ ~.,nndniah! Lane ' Te/. [97£) 24!-4517 .- : ,. Dal.as Foe Wo,lt* Dallas. Texas Metro (972) 263-1553 75229 Fax (972) 241-5174 GENERAL REPORT Project Mansions By The Lake I Number 3137-D7429-302 ICollection Date 10/24/98 IReport Date 10/28/98 To Western Rim Services Report of CYLINDER COLLECTION Identification Method of Test Results: On this collection date, Shane Sparkman, representing Rone Engineers, Inc., arrived on site at the above referenced project to collect concrete cylinders made on October 23, 1998,for curing and compressive strength testing. Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LLMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibilib' for variation in quality. (composition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom ~hey are addressed. c:\wpwin\reports\D7429-302-98\ST October 23, 1998 X~