Loading...
Mansions Phase 1-LR 981028 (4) noneEn ineers ~n~ ~r,~,'~,~r~. ~n~. '~ '~"-~'4 ~oo~niy~t Lane T~(. ~g72~ ~ ~ ~" '~ Dal,as.'For: Wodr, Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-263 I Date of Observation 9/29/98 Report Date 10/28/98 To Western Rim Services Contractor Location SLAB ON GRADE, BUILDING//24 - 45' NORTH, 20' EAST FROM SOUTHWEST CORNER OF BUILDING Time Sampled 8:45 Time Batched 7:45 Weather Condition CLEAR Concrete Temperature {°F) 83 Ambient Temperature {OF) 77 Mix Number 51 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4 1/2 Concrete Cylinder Test(s) No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 11 5A 7 10/06 65000 2300 3000/28 DAYS B 28 10/27 86000 3040 C 28 10/27 85000 3010 D H ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, AET Supervisor, CMT ~. Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:'-,wpwimreports\D7429-263-98'.ST October 28. 1998