Loading...
Mansions Phase 1-LR 981028 (7) Dallas. Fod Wo"th Dallas. Texas Metro (972) 263-1555 75229 ' Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-267 Date of Observation 9/30/98 Report Date 10/28/98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 3 I Truck 618 I Ticket 3071222 Location SLAB ON GRADE, BUILDING //1 - 20' SOUTH, 10' EAST FROM NORTHWEST CORNER OF BUILDING Time Sampled 10:00 Time Batched 9:12 Weather Condition CLEAR Concrete Temperature (°F) 86 Ambient Temperature (°F) 82 Mix Number 51 Mix Description Unit Weight Water Added 15 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4 1/2 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 118A 7 10/07 71000 2510 3000/28 DAYS B 28 10/28 85000 3010 C 28 10/28 90000 3180 D H I I Curing Method I Test Method Standard 6" x 12" I Engineer/Technician R. LOVELADY ASTM C 31 I ASTM C 39 Area 28.27 sq. in. I Signature: Mike Fuller, AET Supervisor, CMT ~. Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hedge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples prowded for testing. We assume no responsibility for variation ~n quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:twpwin..reports\D7429-267-98~ST C:tobe, 28, 1998