Mansions Phase 1-LR 981026 l=lon~ FnginCer,~. lnG. 1 ~ .~ Goodnight Lane Tei. (972~ 24!-4517 -- ineers
Dallas.-'Fon Worth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansions By The Lake Purchase Order
Number 3137-D7429-252 I Date of Observation 9/22/98 Report Date 10/26/'98
To Western Rim Services
Contractor
Location SLAB ON GRADE, BUILDING //22 - 30' EAST, 15' NORTH FROM SOUTHWEST CORNER
Time Sampled 7:15 Time Bitched 6:55 Weather Condition PT CLOUDY
Concrete Temperature (°F) 84 Ambient Temperature (°F) 77 Mix Number 51
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4 1/2
Concrete Cylinder Test(s)
No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi)
111A 7 9/29 87000 3080 3000/28 DAYS
B 28 10/20 100000 3540
C 28 10/20 119000 4210
D H
Curing Method I Test Method Standard 6" x 12" I Engineer/Technician R. LOVELADY
ASTM C 31 I ASTM C 39 Area 28.27 sq. in._L
Signature: Mike Fuller, AET Supervisor, CMT~,~II'
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for ~esting. We assume no
responsibility for variation in quality (composition, appearance, performance, etc,} or any other feature of similar subject matter proviced by
persons or conditions over which -we have no control, Our letters and reports are for the exclusive use of the clients to whom they are
aqoressed.
c:'.wpw~n'.reports,D7429-252-98'ST October 26. 1998