Loading...
Mansions Phase 1-LR 981026 l=lon~ FnginCer,~. lnG. 1 ~ .~ Goodnight Lane Tei. (972~ 24!-4517 -- ineers Dallas.-'Fon Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-252 I Date of Observation 9/22/98 Report Date 10/26/'98 To Western Rim Services Contractor Location SLAB ON GRADE, BUILDING //22 - 30' EAST, 15' NORTH FROM SOUTHWEST CORNER Time Sampled 7:15 Time Bitched 6:55 Weather Condition PT CLOUDY Concrete Temperature (°F) 84 Ambient Temperature (°F) 77 Mix Number 51 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4 1/2 Concrete Cylinder Test(s) No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 111A 7 9/29 87000 3080 3000/28 DAYS B 28 10/20 100000 3540 C 28 10/20 119000 4210 D H Curing Method I Test Method Standard 6" x 12" I Engineer/Technician R. LOVELADY ASTM C 31 I ASTM C 39 Area 28.27 sq. in._L Signature: Mike Fuller, AET Supervisor, CMT~,~II' Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for ~esting. We assume no responsibility for variation in quality (composition, appearance, performance, etc,} or any other feature of similar subject matter proviced by persons or conditions over which -we have no control, Our letters and reports are for the exclusive use of the clients to whom they are aqoressed. c:'.wpw~n'.reports,D7429-252-98'ST October 26. 1998