Loading...
Mansions Phase 1-LR 981026 (2) Ba,.as.-Fo~ ';v'orl, n Dallas. Texas Me~,ro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-253 Date of Observation 9/22/98 Report Date 10.,'26;98 To Western Rim Services Contractor Supplier LATTIMORE Plant 3 I Truck N/A I Ticket 7058773 Location SLAB ON GRADE, BUILDING #22 - 35' EAST, 30' SOUTH FROM NORTHWEST CORNER Time Sampled 8:45 Time Batched N/A Weather Condition PT CLOUDY Concrete Temperature (CF) 81 Ambient Temperature (°F) 81 Mix Number 51 Mix Description Unit Weight Water Added 15 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.0 Concrete Cylinder Test(s) No. (Days) (lbs.) Strength (psi) Strength Required (psi) 112A 7 9/29 71000 2510 3000/28 DAYS B 28 10/20 94000 3330 C 28 10/20 90000 3180 D H Curing Method I TestMethod I Standard 6" x12" I Engineer/TechnicianR. LOVELADY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, AET Supervisor, CMT ///~ Remarks and/or Distribution Distribution: (1) Mr, Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hedge; City of Coppell (1) Mr, Tony Martin; Newport Classic (1) Mr. Doyle Damron; C, D, Construction Consulting L.MITATIONS: The test results presented herein were prepared based upon the spec:ftc samples proviced ;or testing. We assume re responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of sirndar subject matter prey,tied b,/ persons or conditions over which we have no control. Our !etters and reports are for '.he exclusiv6 use of '.he clients to whom they are addressee. ~: wpwm'-reports'.DTA29-253-98'-ST Cc:chef 26, 1998